Work continued on refurbishing Number 1 cab. The team have spent the last couple of weeks trying to trace the source of a minor contamination of the engine oil with some cooling water. Sunday 2nd January saw the engine running and also the fault with the control air was fixed. Work on the track has also continued over the last three months and the 30 foot of track needed to link the panels where the 37 is standing and the rest of the test track was installed on Sunday 2nd January. Fitting out of the newly purchased container has taken some time but it is almost completed. A cooker will be installed for the all important tea breaks!